AI Analysis
Log in to generate an AI summary for this stock.
Log in to generate a MOAT report for this stock.
Log in to generate an earnings report for this stock.
Log in to generate an operating leverage report for this stock.
Log in to generate a management report for this stock.
Log in to generate a valuation report for this stock.
Sitka Gold Corp.
Video analysis: SITKF
All videosNo video analysis for this stock yet. Request one from our team.
News: SITKF
Sitka Drills 159.2 Metres of 1.14 g/t Gold, Including 7.3 Metres of 8.89 g/t Gold, Within 256.9 Metres of 0.84 g/t Gold, Intercepts 13.9 Metres of 0.383% WO3 (Tungsten Trioxide) and Continues to Expand the Rhosgobel Deposit Along Strike and at Depth at Its RC Gold Project, Yukon
New assay results extend gold and tungsten mineralization 350 m east of the easternmost drilling completed in 2025, with additional drilling (assays pending) continuing to intersect RIRGS gold mineralization a further 60 m to the east Drilling to date at Rhosgobel has traced near-surface RIRGS mineralization across a strike length of approximately 1.6 km (see Figure 1). The deposit remains open along strike and to depth Drill Hole DDRCRG-26-071 intersected 159.2 metres of 1.14 g/t gold, including 7.3 m of 8.89 g/t gold, within 256.9 metres of 0.84 g/t gold Drill Hole DDRCRG-26-059 intersected 43.5 metres of 1.29 g/t gold within 217.9 metres of 0.52 g/t gold Drill Hole DDRCRG-26-061 intersected 82.0 metres of 0.75 g/t gold, including 10.4 metres of 1.03 g/t gold, within 322.0 metres of 0.50 g/t gold Drill Hole DDRCRG-26-063 intersected 13.9 metres of 0.383% WO3 confirming significant tungsten mineralization at Rhosgobel Seven drill rigs are currently turning on the Project at Blackjack, Saddle, Eiger, Rhosgobel, Pukelman-Contact and Bear Paw Breccia Zone Approximately 45,000 m of diamond drilling has been completed to date this year in 101 drill holes across the Blackjack, Eiger, and Rhosgobel deposits and the Saddle, Contact, and Bear Paw Breccia Zones as part of the ongoing 60,000 m drill program planned for 2026 Vancouver, British Columbia--(Newsfile Corp. - September 8, 2026) - Sitka Gold Corp. (TSXV: SIG) (FSE: 1RF) (OTCQX: SITKF) ("Sitka" or the "Company") is pleased to announce additional assay results from diamond drill holes completed at the Rhosgobel deposit and to provide an update on the 60,000 metre diamond drilling program currently underway at its 100% owned, road accessible RC Gold Project ("RC Gold" or the "Project") in Canada's Yukon Territory.
Sitka Gold Completes Acquisition of 100% Interest in the Clear Creek Property at Its RC Gold Project, Yukon
Vancouver, British Columbia--(Newsfile Corp. - August 20, 2026) - Sitka Gold Corp. (TSXV: SIG) (FSE: 1RF) (OTCQX: SITKF) ("Sitka" or the "Company") is pleased to announce that it has completed its previously announced accelerated acquisition of a 100% interest in the Clear Creek Property from the Receiver of Victoria Gold Corp., following the granting of an approval and vesting order by the Ontario Superior Court of Justice (Commercial List) on August 18, 2026. This transaction completes Sitka's acquisition of all of the properties comprising the contiguous 447-square-kilometre RC Gold Project in Yukon, consolidating the Company's 100% ownership of the project.
Sitka Drills 218.6 Metres of 1.25 g/t Gold, Including 44.4 Metres of 3.86 g/t Gold, and a Second Interval of 92.7 Metres of 1.14 g/t Gold in a Single Hole at Its RC Gold Project, Yukon
Drilling continues to demonstrate that gold mineralization extends well beyond the current Blackjack deposit, with hole 129 expanding mineralization 150 m east of the resource and hole 132 confirming broad higher-grade mineralization at depth below the current resource envelope DDRCCC-26-132 intersected 218.6 m of 1.25 g/t gold, including 44.4 m of 3.86 g/t gold, and returned a second, separate interval of 92.7 metres of 1.14 g/t gold DDRCCC-26-129 intersected 118.0 m of 0.50 g/t gold, and 32.0 m of 1.44 g/t gold, and 55.0 m of 0.48 g/t gold Six drill rigs are currently turning on the Project at Blackjack, Saddle, Eiger, Rhosgobel and Pukelman-Contact with a seventh drill being mobilized to site Approximately 32,000 m of diamond drilling has been completed to date this year in 63 drill holes across the Clear Creek Intrusive Complex at RC Gold Over 23,000 m of drilling across 54 holes has been completed to date at the Blackjack/Saddle zone, since the last mineral resource update was published in January 2025, which was based on ~18,000 m of drilling. Vancouver, British Columbia--(Newsfile Corp. - August 10, 2026) - Sitka Gold Corp. (TSXV: SIG) (FSE: 1RF) (OTCQX: SITKF) ("Sitka" or the "Company") is pleased to announce additional assay results from diamond drill holes completed at Blackjack and to provide an update on the 60,000 metre diamond drilling program currently underway at its 100% owned, road accessible RC Gold Project ("RC Gold" or the "Project") in Canada's Yukon Territory.
Sitka Gold to Accelerate Acquisition of 100% Interest in the Clear Creek Property at Its RC Gold Project, Yukon
Sitka to accelerate its acquisition of a 100% interest in the Clear Creek Property from the Receiver of Victoria Gold Corp. This transaction completes Sitka's acquisition of all of the properties comprising the contiguous 447-square-kilometre RC Gold Project in Yukon, consolidating Sitka's 100% ownership of the project. Sitka will pay $6 million in cash and deliver a 5.0% NSR royalty on the Clear Creek Property at closing.
Sitka Drills 164.0 Metres of 1.83 g/t Gold Including 45.0 Metres of 3.49 g/t Gold and 2.0 Metres of 15.35 g/t Gold at Its RC Gold Project, Yukon
Sitka reports results for additional diamond drill holes; continues to intercept broad intervals of high-grade gold mineralization in step out drilling at the Blackjack deposit Drill hole DDRCCC-26-128 returned 348.0 m of 1.12 g/t Au, including 164.0 m of 1.83 g/t Au, 45.0 m of 3.49 g/t Au, 2.0 m of 15.35 g/t Au and 2.0 m of 13.65 g/t Au at Blackjack First seven holes received of the 30,000 m of drilling allocated to Rhosgobel this year continue to expand the Rhosgobel deposit with intervals of higher grade mineralization within broad zones of mineralized quartz monzonite Drill hole DDRCRG-26-049 returned 74.8 m of 0.91 g/t Au, including 56.1 m of 1.12 g/t and 3.4 m of 4.01 g/t Au at Rhosgobel Drill hole DDRCRG-26-044 returned 11.4 m of 1.00 g/t Au, and 28.1 m of 1.08 g/t Au including 7.3 m of 2.87 g/t Au at Rhosgobel Six drill rigs are currently turning on the Project at Blackjack, Saddle, Eiger, and Rhosgobel Approximately 24,000 m of diamond drilling has been completed to date this year in 47 drill holes across the Blackjack and Rhosgobel deposits as part of the ongoing 60,000 m drill program planned for 2026 Vancouver, British Columbia--(Newsfile Corp. - July 13, 2026) - Sitka Gold Corp. (TSXV: SIG) (FSE: 1RF) (OTCQX: SITKF) ("Sitka" or the "Company") is pleased to announce assay results from drill hole DDRCCC-26-128 completed at Blackjack and the first seven drill holes received during its 2026 exploration campaign at the Rhosgobel deposit and to provide an update on the 60,000 metre diamond drilling program currently underway at its 100% owned, road accessible RC Gold Project ("RC Gold" or the "Project") in Canada's Yukon Territory. These results continue to expand the high-grade gold zone at the Blackjack deposit (see Figures 1 and 2) and continue to expand the mineralized envelope at the Rhosgobel deposit (see Figures 3 through 5).
Sitka Files Technical Report
Vancouver, British Columbia--(Newsfile Corp. - July 10, 2026) - Sitka Gold Corp. (TSXV: SIG) (FSE: 1RF) (OTCQX: SITKF) ("Sitka" or the "Company") announces that it has filed a technical report on its 100% owned RC Gold Project in the Yukon Territory. The technical report, titled "RC Gold Project, NI 43-101 Technical Report, Dawson Mining District, Yukon Territory" is dated July 10, 2026 and has an effective date of February 25, 2026.
Sitka Continues to Expand High-Grade Gold Mineralization at the Blackjack Deposit, Drilling 94.5 Metres of 1.62 g/t Gold, Including 2.0 Metres of 11.85 g/t Gold, and an Additional Interval of 197.0 Metres of 1.06 g/t Gold, Including 2.0 Metres of 9.95 g/t Gold, in Hole 125 at Its RC Gold Project, Yukon
Sitka reports results for six additional diamond drill holes; continues to intercept significant intervals of high-grade gold mineralization in step out drilling at the Blackjack deposit Drillhole DDRCCC-26-125 returned 94.5 m of 1.62 g/t Au including 2.0 m of 11.85 g/t Au, and a separate interval of 197.0 m of 1.06 g/t Au including 2.0 m of 9.95 g/t Au Drillhole DDRCCC-26-123 returned 214.5 m of 0.97 g/t Au, including 106.9 m of 1.36 g/t Au and 2.0 m of 15.45 g/t Au Drillhole DDRCCC-26-126 returned 153.1 m of 1.33 g/t Au, including 110.0 m of 1.63 g/t Au including 2.0 m of 12.35 g/t Au Over 18,000 m of expansion drilling completed at the Blackjack deposit across 40 holes since the last MRE for Blackjack was published in January 2025; effectively doubling the meterage completed since the last resource estimate was calculated Six drill rigs are currently turning on the Project at Blackjack, Rhosgobel and Saddle Approximately 17,600 m of diamond drilling have been completed to date this year in 30 drill holes across the Blackjack and Rhosgobel deposits as part of the ongoing 60,000 m drill program planned for 2026 Vancouver, British Columbia--(Newsfile Corp. - June 23, 2026) - Sitka Gold Corp. (TSXV: SIG) (FSE: 1RF) (OTCQX: SITKF) ("Sitka" or the "Company") is pleased to announce assay results from six drill holes completed during its 2026 exploration campaign and to provide an update on the 60,000 metre diamond drilling program currently underway at its 100% owned, road accessible RC Gold Project ("RC Gold" or the "Project") in Canada's Yukon Territory. Analytical results for drill holes DDRCCC-26-122 through DDRCCC-26-127 have been received and compiled and are reported herein.