AI Analysis
Log in to generate an AI summary for this stock.
Log in to generate a MOAT report for this stock.
Log in to generate an earnings report for this stock.
Log in to generate an operating leverage report for this stock.
Log in to generate a management report for this stock.
Log in to generate a valuation report for this stock.
Cabral Gold Inc.
Video analysis: CBGZF
All videosNo video analysis for this stock yet. Request one from our team.
News: CBGZF
Cabral Gold Announces First Gold Pour at Phase 1 Mine, Cuiú Cuiú Gold District, Brazil
Vancouver, British Columbia--(Newsfile Corp. - September 10, 2026) - Cabral Gold Inc. (TSXV: CBR) (OTCQX: CBGZF) ("Cabral" or the "Company") is pleased to announce the first gold pour at Cabral's 100% owned Phase 1 Cuiú Cuiú mine in Brazil. Commissioning of the dry circuit at the Cuiú Cuiú mine was completed in July 2026 (see press release dated August 13, 2026).
Cabral Gold Drills 8.9m @ 5.8 g/t gold and Intersects New Mineralized Zone at Jerimum Cima Target, Cuiú Cuiú Gold District, Brazil
Vancouver, British Columbia--(Newsfile Corp. - August 27, 2026) - Cabral Gold Inc. (TSXV: CBR) (OTCQX: CBGZF) ("Cabral" or the "Company") is pleased to announce results from ten additional diamond drill holes at the Jerimum Cima target located within the Cuiú Cuiú Gold District, Brazil. Highlights Drilling at the Jerimum Cima target, located 3km ENE of the Central gold deposit and 3.5km NW of the MG gold deposit at Cuiú Cuiú, has returned 8.9m @ 5.8 g/t gold from 208.1m depth including 1.8m @ 28.4 g/t gold from 212.2m depth in hole DDH411 The intercept in DDH411 is interpreted as a new mineralized zone which is located 200m south of the main mineralized zone at Jerimum Cima.
Cabral Gold Announces Closing of $45 Million Private Placement with Strategic Investor
Vancouver, British Columbia--(Newsfile Corp. - August 24, 2026) - Cabral Gold Inc. (TSXV: CBR) (OTCQX: CBGZF) ("Cabral" or the "Company") is pleased to announce the closing of a non-brokered private placement of 34,582,754 units of the Company (the "Units") at a price of $1.30 per Unit (the "Private Placement") for gross proceeds of $44,957,580. Alpayana S.A.C.
Cabral Gold Receives Operating License for the Cuiú Cuiú Phase I Gold Mine. Construction of ADR Leach Processing Plant Completed.
Vancouver, British Columbia--(Newsfile Corp. - August 13, 2026) - Cabral Gold Inc. (TSXV: CBR) (OTCQX: CBGZF) ("Cabral" or the "Company") is pleased to provide an update on construction and commissioning activities at its Phase 1 gold-in-oxide heap leach project at the Cuiú Cuiú Gold District, Brazil. Highlights Construction of the wet processing circuit at Cuiú Cuiú is more than 90% complete.
Cabral Gold Appoints Accomplished Exploration Geologist Elton Pereira as Vice President Exploration
Vancouver, British Columbia--(Newsfile Corp. - August 5, 2026) - Cabral Gold Inc. (TSXV: CBR) (OTCQX: CBGZF) ("Cabral" or the "Company") is pleased to announce that it has appointed Mr. Elton Pereira as Vice President Exploration, effective immediately.
Cabral Gold Announces Additional Drill Results from Pre-Production Infill Drilling at the MG Gold Deposit, Cuiú Cuiú Gold District, Brazil
Vancouver, British Columbia--(Newsfile Corp. - July 21, 2026) - Cabral Gold Inc. (TSXV: CBR) (OTCQX: CBGZF) ("Cabral" or the "Company") is pleased to announce results from 41 additional reverse circulation ("RC") infill drill holes recently drilled as part of the pre-production drill-to-measured resource upgrade and production de-risking of the gold-in-oxide ore within the MG starter pit at the Cuiú Cuiú Gold District, Brazil. Highlights Results have been received on an additional 41 infill RC holes targeting the gold-in-oxide material in the eastern and central parts of the MG starter pit.
Cabral Gold Commences Commissioning Process of Cuiú Cuiú Gold-in-Oxide Heap Leach Project. Commences Mining and Stacking
Vancouver, British Columbia--(Newsfile Corp. - July 9, 2026) - Cabral Gold Inc. (TSXV: CBR) (OTCQX: CBGZF) ("Cabral" or the "Company") is pleased to provide a construction and commissioning update regarding its Phase 1 gold-in-oxide heap leach project at the Cuiú Cuiú Gold District, Brazil. Highlights Construction of the dry circuit for the Phase 1 gold-in-oxide heap leach project is now complete, with total project construction and commissioning now approximately 85% complete, and +90% of project costs committed under contract Mining of gold-in-oxide ore has commenced, with ore being successfully processed by the sizer, agglomerated, and transported by conveyor systems to the heap leach pads The ADR plant has arrived in country and is expected to be on site later this month.
Cabral Gold Drills Significant New Mineralized Zone between the Central and PDM Gold Deposits and Expands the PDM Gold-in-Oxide Blanket, Cuiú Cuiú Gold District, Brazil
Vancouver, British Columbia--(Newsfile Corp. - June 23, 2026) - Cabral Gold Inc. (TSXV: CBR) (OTCQX: CBGZF) ("Cabral" or the "Company") is pleased to announce results from reconnaissance core drilling recently conducted at the Mutum target within the Cuiú Cuiú Gold District, Brazil. Highlights DDH387 drilled at the Mutum target and located 450m SE of the PDM gold deposit and 1.5km NW of the Central gold deposit, returned 20.7m @ 1.6 g/t gold from 131.4m depth including 2.5m @ 5.7 g/t gold from 146.0m depth The results from DDH387 suggest the presence of a previously unrecognised mineralized zone at Cuiú Cuiú between the Central and PDM gold deposits which are located 2km apart Several holes returned gold in near surface blanket soils and sediments, notably DDH387 which returned 11.5m @ 0.42 g/t gold from surface, DDH381 which returned 7.5m @ 0.40 g/t gold and DDH383 which returned 4.3m @ 0.58 g/t gold The presence of low-grade gold values in near surface oxide material in several holes suggests that the PDM gold-in-oxide blanket could be significantly larger than currently envisaged.